GanttProject is an opensource project management tool. License: GPL3
Copyright (C) 2010-2012 Dmitry Barashev, GanttProject Team

This program is free software; you can redistribute it and/or
modify it under the terms of the GNU General Public License
as published by the Free Software Foundation; either version 3
of the License, or (at your option) any later version.

This program is distributed in the hope that it will be useful,
but WITHOUT ANY WARRANTY; without even the implied warranty of
MERCHANTABILITY or FITNESS FOR A PARTICULAR PURPOSE.  See the
GNU General Public License for more details.

You should have received a copy of the GNU General Public License
along with this program; if not, write to the Free Software
Foundation, Inc., 51 Franklin Street, Fifth Floor, Boston, MA  02110-1301, USA.
 */
package biz.ganttproject.impex.msproject2;

import biz.ganttproject.core.calendar.CalendarEvent;
import biz.ganttproject.core.calendar.GPCalendar;
import biz.ganttproject.core.calendar.GPCalendar.DayType;
import biz.ganttproject.core.calendar.GPCalendarCalc;
import biz.ganttproject.core.calendar.GanttDaysOff;
import biz.ganttproject.core.time.GanttCalendar;
import biz.ganttproject.core.time.TimeDuration;
import net.sf.mpxj.DateRange;
import net.sf.mpxj.Day;
import net.sf.mpxj.Duration;
import net.sf.mpxj.FieldType;
import net.sf.mpxj.MPXJException;
import net.sf.mpxj.Priority;
import net.sf.mpxj.ProjectCalendar;
import net.sf.mpxj.ProjectCalendarException;
import net.sf.mpxj.ProjectCalendarHours;
import net.sf.mpxj.ProjectFile;
import net.sf.mpxj.Rate;
import net.sf.mpxj.RelationType;
import net.sf.mpxj.Resource;
import net.sf.mpxj.ResourceType;
import net.sf.mpxj.TaskMode;
import net.sf.mpxj.TimeUnit;
import net.sourceforge.ganttproject.CustomProperty;
import net.sourceforge.ganttproject.CustomPropertyClass;
import net.sourceforge.ganttproject.CustomPropertyDefinition;
import net.sourceforge.ganttproject.CustomPropertyHolder;
import net.sourceforge.ganttproject.GPLogger;
import net.sourceforge.ganttproject.GanttTask;
import net.sourceforge.ganttproject.IGanttProject;
import net.sourceforge.ganttproject.resource.HumanResource;
import net.sourceforge.ganttproject.resource.HumanResourceManager;
import net.sourceforge.ganttproject.task.ResourceAssignment;
import net.sourceforge.ganttproject.task.Task;
import net.sourceforge.ganttproject.task.TaskContainmentHierarchyFacade;
import net.sourceforge.ganttproject.task.TaskManager;
import net.sourceforge.ganttproject.task.dependency.TaskDependency;
import net.sourceforge.ganttproject.task.dependency.TaskDependencySlice;

import javax.swing.*;
import java.math.BigDecimal;
import java.util.Calendar;
import java.util.Date;
import java.util.HashMap;
import java.util.Map;
import java.util.Map.Entry;

/**
 * Creates MPXJ ProjectFile from GanttProject's IGanttProject.
 *
 * @author dbarashev (Dmitry Barashev)
 */
class ProjectFileExporter {
  private IGanttProject myNativeProject;
  private ProjectFile myOutputProject;

  public ProjectFileExporter(IGanttProject nativeProject) {
    myNativeProject = nativeProject;
    myOutputProject = new ProjectFile();
    myOutputProject.getProjectConfig().setAutoOutlineLevel(true);
    myOutputProject.getProjectConfig().setAutoWBS(true);
    myOutputProject.getProjectConfig().setAutoOutlineNumber(true);
    myOutputProject.getProjectConfig().setAutoResourceUniqueID(false);
    myOutputProject.getProjectConfig().setAutoTaskUniqueID(false);
  }

  ProjectFile run() throws MPXJException {
    Map<Integer, net.sf.mpxj.Task> id2mpxjTask = new HashMap<Integer, net.sf.mpxj.Task>();
    exportCalendar();
    exportTasks(id2mpxjTask);
    exportDependencies(id2mpxjTask);

    Map<Integer, Resource> id2mpxjResource = new HashMap<Integer, Resource>();
    exportResources(id2mpxjResource);

    exportAssignments(id2mpxjTask, id2mpxjResource);
    return myOutputProject;
  }

  private void exportCalendar() {
    ProjectCalendar calendar = myOutputProject.addDefaultBaseCalendar();
    exportWeekends(calendar);
    exportHolidays(calendar);
  }

  private boolean isWorkingDay(int day) {
    return getCalendar().getOnlyShowWeekends() || getCalendar().getWeekDayType(day) == DayType.WORKING;
  }

  private void exportWeekends(ProjectCalendar calendar) {
    ProjectCalendarHours workingDayHours = calendar.getCalendarHours(Day.MONDAY);
    calendar.setWorkingDay(Day.MONDAY, isWorkingDay(Calendar.MONDAY));
    calendar.setWorkingDay(Day.TUESDAY, isWorkingDay(Calendar.TUESDAY));
    calendar.setWorkingDay(Day.WEDNESDAY, isWorkingDay(Calendar.WEDNESDAY));
    calendar.setWorkingDay(Day.THURSDAY, isWorkingDay(Calendar.THURSDAY));
    calendar.setWorkingDay(Day.FRIDAY, isWorkingDay(Calendar.FRIDAY));
    calendar.setWorkingDay(Day.SATURDAY, isWorkingDay(Calendar.SATURDAY));
    if (calendar.isWorkingDay(Day.SATURDAY)) {
      copyHours(workingDayHours, calendar.addCalendarHours(Day.SATURDAY));
    }
    calendar.setWorkingDay(Day.SUNDAY, isWorkingDay(Calendar.SUNDAY));
    if (calendar.isWorkingDay(Day.SUNDAY)) {
      copyHours(workingDayHours, calendar.addCalendarHours(Day.SUNDAY));
    }
  }

  private void copyHours(ProjectCalendarHours from, ProjectCalendarHours to) {
    for (DateRange range : from) {
      to.addRange(range);
    }
  }

  private void exportHolidays(ProjectCalendar calendar) {
    exportHolidays(getCalendar(), calendar);
  }

  static void exportHolidays(GPCalendar gpCalendar, ProjectCalendar calendar) {
    for (CalendarEvent h : gpCalendar.getPublicHolidays()) {
      if (!h.isRecurring && h.getType() == CalendarEvent.Type.HOLIDAY) {
        Date d = h.myDate;
        calendar.addCalendarException(d, d);
      }
      if (!h.isRecurring && h.getType() == CalendarEvent.Type.WORKING_DAY && !calendar.isWorkingDate(h.myDate)) {
        Date d = h.myDate;
        ProjectCalendarException exception = calendar.addCalendarException(d, d);
        exception.addRange(ProjectCalendar.DEFAULT_WORKING_MORNING);
        exception.addRange(ProjectCalendar.DEFAULT_WORKING_AFTERNOON);
      }
    }
  }

  private void exportTasks(Map<Integer, net.sf.mpxj.Task> id2mpxjTask) throws MPXJException {
//    Map<CustomPropertyDefinition, FieldType> customProperty_fieldType = new HashMap<CustomPropertyDefinition, FieldType>();
//    collectCustomProperties(getTaskManager().getCustomPropertyManager(), customProperty_fieldType, TaskField.class);
    Map<CustomPropertyDefinition, FieldType> customProperty_fieldType = CustomPropertyMapping.buildMapping(getTaskManager());
    exportCustomFieldTypes(customProperty_fieldType);
    net.sf.mpxj.Task rootTask = myOutputProject.addTask();
    rootTask.setEffortDriven(false);
    rootTask.setID(0);
    rootTask.setUniqueID(0);
    rootTask.setOutlineLevel(0);
    rootTask.setWBS("0");
    rootTask.setOutlineNumber("0");
    rootTask.setStart(convertStartTime(getTaskManager().getProjectStart()));
    rootTask.setFinish(convertFinishTime(getTaskManager().getProjectEnd()));
    rootTask.setDuration(convertDuration(getTaskManager().createLength(
        getTaskManager().getRootTask().getDuration().getTimeUnit(), getTaskManager().getProjectStart(),
        getTaskManager().getProjectEnd())));
    // rootTask.setDurationFormat(TimeUnit.DAYS);
    rootTask.setTaskMode(TaskMode.AUTO_SCHEDULED);

    int i = 0;
    for (Task t : getTaskHierarchy().getNestedTasks(getTaskHierarchy().getRootTask())) {
      exportTask(t, null, 1, ++i, id2mpxjTask, customProperty_fieldType);
    }
  }

  private void exportTask(Task t, net.sf.mpxj.Task mpxjParentTask, int outlineLevel, int ordinalNum,
      Map<Integer, net.sf.mpxj.Task> id2mpxjTask, Map<CustomPropertyDefinition, FieldType> customProperty_fieldType) {
    final net.sf.mpxj.Task mpxjTask = mpxjParentTask == null ? myOutputProject.addTask() : mpxjParentTask.addTask();
    mpxjTask.setOutlineLevel(outlineLevel);
    String wbs = (mpxjParentTask == null ? "" : mpxjParentTask.getWBS() + ".") + String.valueOf(ordinalNum);
    mpxjTask.setWBS(wbs);
    mpxjTask.setOutlineNumber(wbs);
    mpxjTask.setUniqueID(convertTaskId(t.getTaskID()));
    mpxjTask.setID(id2mpxjTask.size() + 1);
    mpxjTask.setName(t.getName());
    mpxjTask.setNotes(t.getNotes());
    mpxjTask.setMilestone(t.isMilestone());
    mpxjTask.setPercentageComplete(t.getCompletionPercentage());
    mpxjTask.setHyperlink(((GanttTask) t).getWebLink());
    mpxjTask.setIgnoreResourceCalendar(true);

    Task[] nestedTasks = getTaskHierarchy().getNestedTasks(t);
    mpxjTask.setTaskMode(TaskMode.MANUALLY_SCHEDULED);
    Date startTime = convertStartTime(t.getStart().getTime());
    mpxjTask.setStart(startTime);

    Duration duration = convertDuration(t.getDuration());
    mpxjTask.setDuration(duration);
    mpxjTask.setManualDuration(duration);
    if (t.isMilestone()) {
      mpxjTask.setFinish(startTime);
    } else {
      Date finishTime = convertFinishTime(t.getEnd().getTime());
      mpxjTask.setFinish(finishTime);
    }
    mpxjTask.setCost(t.getCost().getValue());
    // mpxjTask.setDurationFormat(TimeUnit.DAYS);
    Duration[] durations = getActualAndRemainingDuration(mpxjTask);
    mpxjTask.setActualDuration(durations[0]);
    mpxjTask.setRemainingDuration(durations[1]);
    mpxjTask.setPriority(convertPriority(t));

    exportCustomProperties(t.getCustomValues(), customProperty_fieldType, new CustomPropertySetter() {
      @Override
      public void set(FieldType ft, Object value) {
        mpxjTask.set(ft, value);
      }
    });
    id2mpxjTask.put(mpxjTask.getUniqueID(), mpxjTask);

    int i = 0;
    for (Task child : nestedTasks) {
      exportTask(child, mpxjTask, outlineLevel + 1, ++i, id2mpxjTask, customProperty_fieldType);
    }

  }

  private Date convertStartTime(Date gpStartDate) {
    Date startTime = myOutputProject.getDefaultCalendar().getStartTime(gpStartDate);
    if (startTime == null) {
      GPLogger.getLogger(getClass()).warning(String.format("Failed to convert start date=%s to start time in MPXJ project, got null. " +
          "Chances are that task start date is non-working day in MPXJ project calendar. Let's take the start date as is", gpStartDate.toString()));
      startTime = gpStartDate;
    }
    Calendar c = (Calendar) Calendar.getInstance().clone();
    c.setTime(gpStartDate);
    c.set(Calendar.HOUR, startTime.getHours());
    c.set(Calendar.MINUTE, startTime.getMinutes());
    return c.getTime();
  }

  private Date convertFinishTime(Date gpFinishDate) {
    Calendar c = (Calendar) Calendar.getInstance().clone();
    c.setTime(gpFinishDate);
    c.add(Calendar.DAY_OF_YEAR, -1);
    Date finishTime = myOutputProject.getDefaultCalendar().getFinishTime(c.getTime());
    if (finishTime != null) {
	    c.set(Calendar.HOUR, finishTime.getHours());
	    c.set(Calendar.MINUTE, finishTime.getMinutes());
    }
    return c.getTime();

  }

  private Duration convertDuration(TimeDuration duration) {
    return Duration.getInstance(duration.getLength(), TimeUnit.DAYS);
  }

  private static Duration[] getActualAndRemainingDuration(net.sf.mpxj.Task mpxjTask) {
	  return getActualAndRemainingDuration(mpxjTask, 1.0);
  }

  private static Duration[] getActualAndRemainingDuration(net.sf.mpxj.Task mpxjTask, double load) {
    TimeUnit durationUnits = mpxjTask.getDuration().getUnits();
    double actualWork = (mpxjTask.getDuration().getDuration() * mpxjTask.getPercentageComplete().doubleValue() * load) / 100;
    double remainingWork = mpxjTask.getDuration().getDuration() - actualWork;

    return new Duration[] { Duration.getInstance(actualWork, durationUnits),
        Duration.getInstance(remainingWork, durationUnits) };
  }

  private void exportDependencies(Map<Integer, net.sf.mpxj.Task> id2mpxjTask) {
    for (Task t : getTaskManager().getTasks()) {
      net.sf.mpxj.Task mpxjTask = id2mpxjTask.get(convertTaskId(t.getTaskID()));

      TaskDependencySlice dependencies = t.getDependenciesAsDependant();
      for (TaskDependency dep : dependencies.toArray()) {
        net.sf.mpxj.Task mpxjPredecessor = id2mpxjTask.get(convertTaskId(dep.getDependee().getTaskID()));
        assert mpxjPredecessor != null : "Can't find mpxj task for id=" + dep.getDependee().getTaskID();
        mpxjTask.addPredecessor(mpxjPredecessor, convertConstraint(dep), convertLag(dep));
      }
    }
  }

  private RelationType convertConstraint(TaskDependency dep) {
    switch (dep.getConstraint().getType()) {
    case finishstart:
      return RelationType.FINISH_START;
    case startfinish:
      return RelationType.START_FINISH;
    case finishfinish:
      return RelationType.FINISH_FINISH;
    case startstart:
      return RelationType.START_START;
    default:
      assert false : "Should not be here";
      return null;
    }
  }

  private static Duration convertLag(TaskDependency dep) {
    // TODO(dbarashev): Get rid of days
    return Duration.getInstance(dep.getDifference(), TimeUnit.DAYS);
  }

  private Priority convertPriority(Task t) {
    switch (t.getPriority()) {
    case LOWEST:
      return Priority.getInstance(Priority.LOWEST);
    case LOW:
      return Priority.getInstance(Priority.LOW);
    case NORMAL:
      return Priority.getInstance(Priority.MEDIUM);
    case HIGH:
      return Priority.getInstance(Priority.HIGH);
    case HIGHEST:
      return Priority.getInstance(Priority.HIGHEST);
    default:
      assert false : "Should not be here";
      return Priority.getInstance(Priority.MEDIUM);
    }
  }

  private int convertTaskId(int taskId) {
    return taskId == 0 ? getMaxTaskID() + 1 : taskId;
  }

  private int getMaxTaskID() {
    int maxID = 0;
    for (Task t : getTaskManager().getTasks()) {
      if (t.getTaskID() > maxID) {
        maxID = t.getTaskID();
      }
    }
    return maxID;
  }

  private void exportResources(Map<Integer, Resource> id2mpxjResource) throws MPXJException {
    Map<CustomPropertyDefinition, FieldType> customProperty_fieldType = CustomPropertyMapping.buildMapping(getResourceManager());
    exportCustomFieldTypes(customProperty_fieldType);
    for (HumanResource hr : getResourceManager().getResources()) {
      exportResource(hr, id2mpxjResource, customProperty_fieldType);
    }
  }

  private void exportCustomFieldTypes(Map<CustomPropertyDefinition, FieldType> customProperty_fieldType) {
    for (Entry<CustomPropertyDefinition, FieldType> e : customProperty_fieldType.entrySet()) {
      String alias = e.getKey().getName();
      if ("".equals(alias.trim())) {
        alias = e.getValue().getName();

      }
      myOutputProject.getCustomFields().getCustomField(e.getValue()).setAlias(alias);
    }
  }

  private void exportResource(HumanResource hr, Map<Integer, Resource> id2mpxjResource,
      Map<CustomPropertyDefinition, FieldType> customProperty_fieldType) throws MPXJException {
    final Resource mpxjResource = myOutputProject.addResource();
    mpxjResource.setUniqueID(hr.getId()  + 1);
    mpxjResource.setID(id2mpxjResource.size() + 1);
    mpxjResource.setName(hr.getName());
    mpxjResource.setEmailAddress(hr.getMail());
    mpxjResource.setType(ResourceType.WORK);
    mpxjResource.setCanLevel(false);
    if (hr.getStandardPayRate() != BigDecimal.ZERO) {
      mpxjResource.setStandardRate(new Rate(hr.getStandardPayRate(), TimeUnit.DAYS));
    }

    exportDaysOff(hr, mpxjResource);
    exportCustomProperties
        (hr, customProperty_fieldType, new CustomPropertySetter() {
      @Override
      public void set(FieldType ft, Object value) {
        mpxjResource.set(ft, value);
      }
    });
    id2mpxjResource.put(hr.getId(), mpxjResource);
  }

  private static interface CustomPropertySetter {
    void set(FieldType ft, Object value);
  }

  private static void exportCustomProperties(CustomPropertyHolder holder,
      Map<CustomPropertyDefinition, FieldType> customProperty_fieldType, CustomPropertySetter setter) {
    for (CustomProperty cp : holder.getCustomProperties()) {
      FieldType ft = customProperty_fieldType.get(cp.getDefinition());
      if (ft != null) {
        setter.set(ft, convertValue(cp));
      }
    }
  }

  private static Object convertValue(CustomProperty cp) {
    if (cp.getDefinition().getPropertyClass() == CustomPropertyClass.DATE) {
      GanttCalendar value = (GanttCalendar) cp.getValue();
      return value.getTime();
    }
    return cp.getValue();
  }

  private void exportDaysOff(HumanResource hr, Resource mpxjResource) throws MPXJException {
    DefaultListModel daysOff = hr.getDaysOff();
    if (!daysOff.isEmpty()) {
      ProjectCalendar resourceCalendar = mpxjResource.addResourceCalendar();
      resourceCalendar.addDefaultCalendarHours();
      exportWeekends(resourceCalendar);
      resourceCalendar.setParent(myOutputProject.getDefaultCalendar());
      // resourceCalendar.setUniqueID(hr.getId());
      for (int i = 0; i < daysOff.size(); i++) {
        GanttDaysOff dayOff = (GanttDaysOff) daysOff.get(i);
        resourceCalendar.addCalendarException(dayOff.getStart().getTime(), dayOff.getFinish().getTime());
      }
    }
  }

  private void exportAssignments(Map<Integer, net.sf.mpxj.Task> id2mpxjTask, Map<Integer, Resource> id2mpxjResource) {
    for (Task t : getTaskManager().getTasks()) {
      net.sf.mpxj.Task mpxjTask = id2mpxjTask.get(convertTaskId(t.getTaskID()));
      for (ResourceAssignment ra : t.getAssignments()) {
        Resource mpxjResource = id2mpxjResource.get(ra.getResource().getId());
        net.sf.mpxj.ResourceAssignment mpxjAssignment = mpxjTask.addResourceAssignment(mpxjResource);
        mpxjAssignment.setUnits(ra.getLoad());
        mpxjAssignment.setStart(mpxjTask.getStart());
        mpxjAssignment.setFinish(mpxjTask.getFinish());

        mpxjAssignment.setWork(mpxjTask.getDuration());
        Duration[] durations = getActualAndRemainingDuration(mpxjTask, ra.getLoad() / 100.0);
        mpxjAssignment.setActualWork(durations[0]);
        mpxjAssignment.setRemainingWork(durations[1]);
      }
    }
  }

  private TaskManager getTaskManager() {
    return myNativeProject.getTaskManager();
  }

  private TaskContainmentHierarchyFacade getTaskHierarchy() {
    return getTaskManager().getTaskHierarchy();
  }

  private HumanResourceManager getResourceManager() {
    return myNativeProject.getHumanResourceManager();
  }

  private GPCalendarCalc getCalendar() {
    return getTaskManager().getCalendar();
  }
}